• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
BSR Südkreuz site | Competition | 2nd place

All parts of the building are designed constructively and spatially in such a way that they can be adapted, converted …

Klimaschutzpartner Berlin 2024 | Winner | Category A: realised projects

At this year’s “climate protection partner of the year”-awards (“Klimaschutzpartner des Jahres”), the project “Kokoni One – Timber Construction Quarter …

Recognition | Mobilität.Punkt Detmold

From the jury’s statement: “The work represents a future-oriented contribution to the climate-friendly management of existing buildings. We are delighted …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line