• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
Verwaltungsgebäude Tierpark
17 April – 08 May | Exhibition “Fix it! – Umbau statt Abriss” | DAZ Berlin

16 April, 6pm | Vernissage “How do we want to build in future?” with Natural Building Lab (TU Berlin) and …

Sustainable Administrational Building in Paulinenaue | Construction start

We are happy to announce that we are about to start construction on a new administrational building for the Regional …

Heinze Architekturfunk #135 | Prof. Andrea Klinge: Die Abrüstung des Bausektors
HEINZE ARCHITEKTURFUNK #135 | PROF. ANDREA KLINGE: THE DISARMAMENT OF THE CONSTRUCTION SECTOR

In a new episode of the Heinze podcast Architekturfunk, Andrea Klinge, ZRS Architekten, talks about the steps that will bring …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line