• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
Zertifikatsstudium Lehmbau | Bauhaus Universität Weimar
Start of the second year of the certificate course in building with earth | Bauhaus-Universität Weimar

In the summer semester of 2026, the one-semester part-time certificate course in earth construction began for the second time at …

Design competition “New SEO Headquarter”

Within the design competition ‘New SEO Headquarters’ we planned an expansion for the location of the SEO in Vianden and …

14TH JANUARY 2024 | “RETHINKING INSTEAD OF DEMOLISHING”, INITIATIVE AN.DERS URANIA | AKADEMIE DER KÜNSTE

16.00 – 17.30 | Round Table Talk | with Prof. Andrea Klinge (among others) A panel discussion on the planned …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line