• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
Teilsanierung Französisches Gymnasium | Sanierung
ON SITE 01 | Partial Refurbishment Französisches Gymnasium, Berlin

The refurbishment of the 26 individual roof areas of the “Französisches Gymnasium” (“French Gymnasium”) in Berlin Tiergarten is progressing steadily. …

Holz Ziegel Lehm | Pilotprojekt nachhaltiger Geschosswohnungsbau Berlin
On Site 02 | Holz Ziegel Lehm – Pilot Project Sustainable Housing Berlin

The two buildings of the pilot project Holz Ziegel Lehm in Alt-Britz are constantly rising. The envelope of the timber …

Kick-Off: Europäisches Forschungsprojekt Sircular
Kick-Off: European Research Project SIRCULAR

The SIRCULAR research project held its kick-off meeting in June. 22 partners from six European countries, including ZRS Architekten, are …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line