• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
REALLABOR B(E) WARE | Aus der Forschung ohne Umwege in die Umsetzung
“Reallabor B(e) Ware” | From research straight to implementation

The “Reallabor B(e) Ware”, a joint project between the Natural Building Lab at TU Berlin and ZRS Architects and Engineers, …

Conservation of a historic rammed earth wall | Greene/Einbeck

The almost 200-meter-long historic rammed earth enclosure wall in Greene near Einbeck is a monument of national importance and was …

Regierender Bürgermeister von Berlin besucht Holz Ziegel Lehm
Governing Mayor of Berlin visits Holz Ziegel Lehm

On July 14, Berlin’s seven state-owned housing associations organized an excursion to exemplary new projects (“Neubautour”) for Governing Mayor Kai …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line