• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
01.02.2024 | 19–21 Uhr | Webseminar „Erdbebenbeständigkeit im Lehmbau“ | Prof. Dr.-Ing. Christof Ziegert
1ST FEBRUARY 2024 | WEB SEMINAR “EARTHQUAKE RESISTANCE IN CLAY CONSTRUCTION” | ARCHITECTS FOR FUTURE

19.00–21.00 | Prof. Dr.-Ing. Christof Ziegert Architects for Future is organising a web seminar with Prof. Dr.-Ing. Christof Ziegert on …

On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in …

Zertifikatsstudium Lehmbau | Bauhaus Universität Weimar
Start of the second year of the certificate course in building with earth | Bauhaus-Universität Weimar

In the summer semester of 2026, the one-semester part-time certificate course in earth construction began for the second time at …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line