• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
GROUNDBREAKING CEREMONY AT THE KONRAD-ZUSE-SCHULE

On Thursday, 19 March 2020 the time capsule was brought to the construction site of the new workshop building of the Konrad-Zuse-Schule. This …

Holz Ziegel Lehm | Pilotprojekt Nachhaltiger Geschosswohnungsbau Berlin | Tag der Architektur 2025
28 – 29 June 2025 | Tag der Architektur Berlin

Saturday, 28 June, 2 pm and 4 pm: Architectural tour Holz Ziegel Lehm | Pilot Projekt Sustainable Housing Berlin (German) …

FINISSAGE FOR THE BERLIN TIMBER CONSTRUCTION PRIZE EXHIBITION | PODIUM DISCUSSION WITH EIKE ROSWAG-KLINGE

Monday 13th of January at 6 pm at the Senatsverwaltung für Stadtentwicklung und Wohnen (Senate for City Development and Living). …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line