• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
Holz Ziegel Lehm | Pilot Project Sustainable Housing Berlin

Two buildings are being built on a plot in Alt-Britz, one in timber-frame and the second in brick-and-wood.
The floor plans, floor heights and cubature are identical.
For the purpose of comparability, the houses will be scientifically monitored in the first years after completion.

Read more at: Holz Ziegel Lehm

Posted on: 23. May 2022

Related Articles
Project team of ‘Gut Buchholz’ nominated for the Energy Efficiency Award 2020

We are very pleased to announce that the team behind the project Gut Buchholz has been selected by the dena …

KICK-OFF: EUROPÄISCHES FORSCHUNGSPROJEKT INBUILT PROJECT
KICK-OFF: EUROPEAN RESEARCH PROJECT INBUILT PROJECT

The INBUILT European research project, in which ZRS Architekten is involved, held its kick-off meeting at the end of 31 …

dieNACHWACHSENDEstadt Hub / Make City Festival 2018 / 23 – 28.06

ZRS, as part of the dieNACHWACHSENDEstadt Network, will be co-hosting a Hub and series of accompanying events during the Make City …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line