• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
RE4 HONORED WITH A RECOGNITION AT THE DEUTSCHER HOLZBAUPREIS 2019

We are pleased to announce that our contribution RE4 prototype was awarded with a recognition at the Deutscher Holzbaupreis 2019 in …

PUBLICATION: BUILDING AND LIVING IN THE CYCLE OF NATURE – SOCIAL HOUSING AND KINDERGARTEN AT ELLENER HOF, BREMEN

The new issue of DBZ on the topic of circular building presents our project Woof & Skelle: Building Ensemble for …

recyclable construction in the ‘Baunetzwoche’

Andrea Klinge talks in an interview about the construction with waste materials and gives an insight into our research project RE4. …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line