• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Lelf

The assembly of the administrational building for LELF (Regional Department for Rural Development) in Paulinenaue has begun. The walls in a timber frame construction and the ceilings in glulam timber are prefabricated and assembled on site. The next step in the assembly is to mount the large frame trusses that will span over the large hall.

Posted on: 24. September 2020

Related Articles
Making Lewes Festival 2018 / Leon Radeljic ZRS_A / 29.09

Leon Radeljic (ZRS Architekten, Berlin) and the Jiyan Foundation for Human Rights will present ZRS’s “Therapy Centre for Women & …

Veröffentlichung: Baunetz Meldung | Reallabor mit Frischetheke
Publication: Baunetz Meldung | Living lab with a deli counter

The Edeka Future Market Nauen has been published on Baunetz. The timber construction, featuring spans of 16.4 meters, is located about …

Grundsteinlegung Museums-Pavillon und Touristische Wissenspfade TU Berlin
Laying of the Foundation Stone of The Museum Pavilion and Touristic Information Trails

Monday 10 November 2025 was the long-anticipated day of the laying of the foundation stone of the Museum Pavilion and …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line