On site 01 | Waste Recycling Station Augsburg
The load-bearing earth block masonry structure of the Waste Recycling Station Augsburg is taking shape – the masonry walls of the ground floor of the future administration building are already in place. The clay brick masonry is supplemented with conventional bricks in wall segments with high loads. The cross-laminated timber ceiling above the ground floor has also been installed. Currently, the masonry walls of the second floor are being built to allow for completion of the shell construction in October.
Photo 1: AVA Abfallverwertung Augsburg
Photo 2–5: ZRS Ingenieure