On site | Ellener Hof Bremen

The wooden facade of the Kindergarten building has now been completed and inspires with its lively structure. The scaffolding has been disassembled and only remains on the west façade, where the fire wall, which also was designed as a timber post and beam construction, will soon be plastered. Inside the building, the screed including underfloor heating has been completed and is currently being heated. The filling work on the walls is also already in progress. At the start of next year the installation of the acoustic suspended ceilings, the ELT fine installations and the flooring will follow.

We are looking forward to the final spurt with interior construction at the beginning of 2021!

Posted on: 21. December 2020