• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Konrad-Zuse-schule

The assembly of the workshop building for the Konrad-Zuse-Schule is progressing and the timber walls on the ground floor have now been installed. The elevator shaft is also constructed in massive timber to further reduce the use of concrete.

https://vimeo.com/427662465

 

Posted on: 11. June 2020

Related Articles
Klimaschutzpartner Berlin 2024 | Winner | Category A: realised projects

At this year’s “climate protection partner of the year”-awards (“Klimaschutzpartner des Jahres”), the project “Kokoni One – Timber Construction Quarter …

RE4 HONORED WITH A RECOGNITION AT THE DEUTSCHER HOLZBAUPREIS 2019

We are pleased to announce that our contribution RE4 prototype was awarded with a recognition at the Deutscher Holzbaupreis 2019 in …

Kick-Off und erster Workshop: Europäisches Forschungsprojekt Greenest
KICK-OFF AND FIRST WORKSHOP: EUROPEAN RESEARCH PROJECT GREENEST

As part of the EU research project ‘GreeNest’ (NEST InGrained ecosystem foR zEro EmissioN buildings), 20 European partners, including ZRS …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line