On site | Konrad-Zuse-schule

The assembly of the workshop building for the Konrad-Zuse-Schule is progressing and the timber walls on the ground floor have now been installed. The elevator shaft is also constructed in massive timber to further reduce the use of concrete.

https://vimeo.com/427662465

 

Posted on: 11. June 2020

Related Articles
dieNACHWACHSENDEstadt Hub / Make City Festival 2018 / 23 – 28.06

ZRS, as part of the dieNACHWACHSENDEstadt Network, will be co-hosting a Hub and series of accompanying events during the Make City …

PUBLICATION: INGENIEURBAUKUNST 2024

The Yearbook of Civil Engineering 2024 brings together current buildings by engineers from Germany that showcase the entire breadth of …

GERMAN SUSTAINABILITY AWARD | U-HALLE MANNHEIM

The U-Halle in Mannheim was honoured with the German Sustainability Award (DNP) 2023. Hütten & Paläste transformed the 20,000 m² …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line