• Architecture
  • Earth building
  • Engineering
  • Research and Laboratory
  • Office
  • Contact
  • Privacy

Menu
  • EN
  • DE
On site | Konrad-Zuse-schule

The assembly of the workshop building for the Konrad-Zuse-Schule is progressing and the timber walls on the ground floor have now been installed. The elevator shaft is also constructed in massive timber to further reduce the use of concrete.

https://vimeo.com/427662465

 

Posted on: 11. June 2020

Related Articles
Weihnachtsgruß
Merry Christmas and a Happy New Year!

In turbulent times full of unexpected challenges the trustful cooperation with reliable partners is an assurance for the successful development …

Heinze Architekturfunk #135 | Prof. Andrea Klinge: Die Abrüstung des Bausektors
HEINZE ARCHITEKTURFUNK #135 | PROF. ANDREA KLINGE: THE DISARMAMENT OF THE CONSTRUCTION SECTOR

In a new episode of the Heinze podcast Architekturfunk, Andrea Klinge, ZRS Architekten, talks about the steps that will bring …

Creative City Berlin Interview Prof. Eike Roswag-Klinge

Prof. Eike Roswag-Klinge was interviewed by Creative City Berlin Magazine in the run-up to MakeCity Festival 2018, where ZRS will be …

  • ZRS Architekten Ingenieure
  • Schlesische Straße 26
  • Aufgang A
  • 10997 Berlin
  • +49 (0)30 398 00 95-0
  • info@zrs.berlin
  • We use Rapidmail (Privacy policy)
    Thank You
    Check Your inbox
  • ZRS on instagram
  • ZRS on vimeo
  • ZRS on Baunetz Architecten
  • ZRS on Competition Line